Thursday, April 22, 2010

design evaluation

Bravotech design and manufacture WCDMA, CDMA signal Power-Amplifier and filter, I belongs to manufacture department,1. Improve production chi hair straightener process.2. Establish and revise standards for outgoing inspection and inprocess inspection.3. Involved in design evaluation4. Analysis root cause for customer complain and internal failure, and improve it with other departments.5. And training inspectors, arrange QE, IPQC and chi flat iron working.
http://azerbaijanvision.com/forum
http://www.pkp.fora.pl
http://forum.excel-pratique.com
http://gwtkustom.xooit.com
http://forum.ostrodaonline.pl
Administer supplier of metal box, install polo shirts cable, Dc-Dc module.And supervise 2~3 groups inspectors.About the incoming box/tank on Zhongxing production line, NG rating was 50% in Sep 2000; after 2003, the NG rating is around 1%. About cable-install chi flat iron suppliers in July 2000, my inspectors' check out 34% products is NG on the supplier site, after chi hair straighteners July 2003 only 7% is NG.Understand punch, cut, electroplating, powder, mould. I response to some suppliers quality performance, theses suppliers manufacture PCBA, PCB, metal parts, plastic parts, motor and wire. My actions include audit line, first article verification, follow cheap ralph lauren polo shirts &CAR, process certification, source verification, audit quality system, and training SPC. Xerox quality system is built on TQM & zero defects. At 1998, 1900ppm defective was in shipped parts, only 300ppm defective was in shipped parts at 1999.
http://nfwig.spaces.live.com/default.aspx
http://kwoegn6.spaces.live.com/default.aspx
http://kwogn1980.spaces.live.com/default.aspx
http://mwiog.spaces.live.com/default.aspx
http://kwegn.spaces.live.com/default.aspx